INSTRUMENT TRANSFORMERS

(As per I S CPRI Approval)



11 KV Metering combined set 10/5A to 75/5A.


11 KV Current Transformer


11 KV III Phase Potential Transformer


33 KV Current Transformer


33 KV Potential Transformer


MANUFACTURING OF INSTRUMENT TRANSFORMERS:


  • G.S. Electricals has own Design skills to customize a Instrument Transformer for a Particular application and specification, the company has flexibility to offer Instrument transformer oil immersed.
  • G.S. Electricals Designs are periodically validated As per I S 3156, 2705 and have Independent testing facilities.
  • The company has been equipped with all the machinery, Testing equipment, Qualified Experience Technical Persons in the same field more than 2 decades.
  • G.S. Electricals design activity reviewed as per I S standards. The company is eligible to make any Instrument transformer as per customers requirements.
  • G.S. Electricals has selected The raw material used for the manufacturing of our produced are been supplied by reputed company which maintain quality.
  • G S E will take step by step care in the procedure of manufacturing Instrument Transformers give the customers quality product.
  • We follow the below procedure to give quality assurance to customer gives 100% quality assurance.


MANUFACTURING PROCESS OF INSTRUMENT TRANSFORMERS:


  • Core Building
  • Core/Coil Assembly
  • Formation of winding connections.
  • Testing first Ratio, Resistance Etc
  • Drying out the Assembled core and windings
  • Pre Tanking (All routine Tests)
  • Pre tanking Inspection
  • Tanking
  • Painting
  • Final Testing
  • Dispatch


TESTING OF INSTRUMENT TRANSFORMERS:


  • G.S.Electricals is equipped with 2 Instrument Transformer Testing Kit. (ELTEL)
  • Each G S E Brand Transformer will undergo all required tests after the manufacturing process.
  • Testing of each G S E Transformer is done by Testing kits under the experienced Engineers.
  • Our testing kits are calibrated every year from the Govt. approved centers.
  • Each G S E Transformer will be tested from initial job stage to final tank state.
  • The product required by the customers will be dispatched after passing all the tests.


QUALITY POLICY OF INSTRUMENT TRANSFORMERS:


  • G.S. Electricals Manufacture each G S E brand Transformer step by step procedure for Quality assurance
  • Our quality policy I S to provide the customer a "QUALITY PRODUCT AT ECONOMICAL COST"